What's included
Pressure wash of every block, plus re-sanding the joints with kiln-dried sand. Skipping the re-sand is how block paving starts shifting and growing weeds within a season - it's part of the job, not an upsell.
Why re-sanding matters
Kiln-dried sand locks the blocks together and blocks weed growth in the joints. Without it, a clean block paving driveway looks great for a few weeks and then starts moving underfoot.
Typical cost
A standard 2-car block paving driveway (30-50m²) typically runs £240-£400 including the re-sand, depending on how much sand the joints need.